ANALISIS KAPASITAS TAMPUNGAN BANJIR KOLAM LUMPUR SIDOARJO

Authors

  • Samuel J. Sutanto

DOI:

https://doi.org/10.32679/jsda.v5i2.469

Keywords:

Flood, Existing and Planning condition, the result of simulation, suggestion.

Abstract

A simulation using the HEC-HMS model has been carried out to discover height of flood level in main
pond. The result shows that existing condition of the pond is not sufficient for controlling flood although the
pond had been dredged. Flood will overflow about 0.57-0.69m above the dyke in existing condition, and
about 0.062-0.12m in dredged condition. Suggestions for prevention action are adding the amount of intake
pipes, increasing dyke elevation and extending the dredging area. Flood will also occur in pond 5
particularly for the return period of 10 years if BPLS does not take serious action of prevention such as
dredging and increasing dyke elevation.

References

Donald L. Wolfe, dkk., 2006.

. Los Angeles County Departement of

PublicWorks.

F. Mulyantari., Samuel Jonson., 2007.

, Prosiding PIT HATHI XXIV,

Makasar.

F. Mulyantari., 2007.

, Modul pelatihan Hidrologi

terapan, Puslitbang Sumber Daya Air

Bandung, November 2007.

MGS Engineering Consultant., 2002.

, Prepare for

Washington State Departement of Transportation,

OlympiaWA.

Tim Nasional PSLS., 2007.

US Army Corps of Engineers., 2005.

Hydrologic Engineering Center, Davis CA.

Yen Ben Chie., 1992.

Water Resources Publications,

Colorado.

Published

2018-04-13

How to Cite

Sutanto, S. J. (2018). ANALISIS KAPASITAS TAMPUNGAN BANJIR KOLAM LUMPUR SIDOARJO. JURNAL SUMBER DAYA AIR, 5(2), 95–104. https://doi.org/10.32679/jsda.v5i2.469