The Effort Of Performance Optimization With Basic Design Of Revitalization For Treatment Instalation Of Waste Water Cisirung, South Bandung

Authors

  • Ratna Adiana Pusat Penelitian dan Pengembangan Sumber Daya Air
  • Ratna Hidayat Puslitbang Sumber Daya Air
  • Iskandar A Yusuf
  • Misbahudin Misbahudin Institut Teknologi Bandung
  • Ahmad Taufiq Puslitbang SDA

DOI:

https://doi.org/10.32679/jsda.v14i1.313

Keywords:

Basic Design, Cisirung, IPAL, MBBR, Revitalization

Abstract

In relation to the efforts of restoration and water pollution control (PPA) into the upstream Citarum River, the revitalization of IPAL Cisirung is done to increase the capacity to optimize its performance. IPAL Cisirung is built with wastewater, chemical and biological waste treatment technology. This activity is carried out by conducting field survey and sample testing in the laboratory. The current wastewater discharge that goes to IPAL Cisirung is 206,10 L/sec. The purpose of this activity is to make basic design of IPAL Cisirung revitalization as reference of Detail Engineering Design (DED) with planning capacity of 350 L/sec. Water sampling is done based on the description of the processing unit that must be revitalized, namely equalization tub, sedimentation bed outlet I and sedimentation basin II. The result of laboratory test showed that the optimum condition of turbidity was 28.6 NTU. Revitalization of the biological treatment unit is designed using the Moving Bed Biofilm Reactor (MBBR) technology. The advantages are very effective in reducing COD by 85%, reducing nitrogen through nitrification process and able to absorb TSS or MLSS as much as 2400 mg/L.

Author Biography

Ratna Adiana, Pusat Penelitian dan Pengembangan Sumber Daya Air

Kepala Bagian Keuangan dan Umum - Pusat Litbang Sumber Daya Air

References

Adiana, R. 2017. Pilihan untuk Kinerja yang Optimum terhadap Barang Milik Negara (BMN) Instalasi Pengolahan Air Limbah (IPAL) Cisirung, Daerah Industri Bandung Selatan. Seminar Litbang, Pusat Penelitian dan Pengembangan Sumber Daya Air.

American Public Health Association. 1999. Standard Methods for the Examination of Water and Wastewater. America Water Works Association, Water Environment Federation.

College of Tropical Agriculture and Human Resources. 2010. Guidelines for Livestock Waste Management. University of Hawaii-Manoa in collaboration with Hawaii State Department of Health.

Departemen Permukiman dan Pengembangan Wilayah. 2000. Berita Acara Nomor: 17/BA/M/2000 Tentang Serah Terima Pengelolaan Instalasi Pengolahan Air Limbah (IPAL) Cisirung Daerah Industri Bandung Selatan. Ditandatangani oleh Menteri Kimbangwil dan Bupati Bandung pada tanggal 19 April 2000.

Keputusan Presiden. 2012. Penetapan Wilayah Sungai. Kepres Nomor 12 Tahun 2012.

Lariyah, M. S., Mohiyaden, H. A., Hayder, G., Hussein, A., Basri, H., Sabri, A. F., dan Noh, M. N. 2016. Application of Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed Activated Sludge (IFAS) for Biological River Water Purification System: A Short Review. Earth and Environmental Science 32 (2016) 012005.

Mcquarrie, J. dan Boltz, J. 2011. Moving Bed Biofilm Reactor Technology: Process Applications, Desgin and Performance. Water Environment Research 83 (6): 560-575.

PERMENLHRI. 2014. Baku Mutu Air Limbah. Peraturan Menteri Lingkungan Hidup Republik Indonesia No. 5 Tahun 2014.

PERMENLHRI. 2016. Baku Mutu Air Limbah Domestik. Peraturan Menteri Lingkungan Hidup Republik Indonesia No. P.68/Menlhk-Setjen/2016.

PT. Darma Indra Bandung. 2008. Pengelola IPAL Cisirung Bandung Selatan.

Puslitbang Sumber Daya Air. 2012. Data Kualitas Air, DAS Citarum. Balai Lingkungan Keairan. Bandung.

Pusltibang Sumber Daya Air. 2016. Basic Design Revitalisasi Cluster IPAL Industri Cisirung, Output Kegiatan Teknologi Restorasi Kualitas Air Sungai Citarum Hulu. No. SM/IP16.01/01.a.6/LK/2016.

Standar Nasional Indonesia. 2008. Air dan Air Limbah – Bagian 59: Metode Pengambilan Contoh Air Limbah. SNI 6989.59.2008.

Standar Nasional Indonesia. 2009. Air dan Air Limbah – Bagian 2: Cara Uji Kebutuhan Oksigen Kimiawi (Chemical Oxygen Demand/COD) dengan Refluksi Tertutup secara Spektrofotometri. SNI 6989.2:2009.

Standar Nasional Indonesia. 2009. Air dan Air Limbah – Bagian 72: Cara Uji Kebutuhan Oksigen Biokimia (Biochemical Oxygen Demand/BOD). SNI 6989.72:2009.

Tchobanoglous, G., Burton, F. L., dan Stensel, H. D. 2003. Wastewater Engineering: Treatment and Reuse, Edisi 4. McGrawHill, USA.

Tim Cisirung BLKK. 2016. Teknologi Restorasi Kualitas Air Sungai Citarum Hulu. Kegiatan Revitalisasi Cluster IPAL Industri Cisirung. Puslitbang Sumber Daya Air.

Undang-undang Republik Indonesia. 2009. Perlindungan dan Pengelolaan Lingkungan Hidup. UU No. 32 Tahun 2009.

Yusuf, I. A. 2016. Analisis Pengendalian Pencemaran Air di Zona Hulu Sungai Citarum dengan Model Multidimensional Scalling. Jurnal Sumber Daya Air, 12 (1), 17 – 32.

Yusuf, I. A., Sudjianto, W., dan Rahmilia, S. 2016. Basic Design Revitalisasi Cluster IPAL Industri Cisirung. Seminar Hasil Litbang, Pusat Litbang Sumber Daya Air.

Published

2018-07-10

How to Cite

Adiana, R., Hidayat, R., Yusuf, I. A., Misbahudin, M., & Taufiq, A. (2018). The Effort Of Performance Optimization With Basic Design Of Revitalization For Treatment Instalation Of Waste Water Cisirung, South Bandung. JURNAL SUMBER DAYA AIR, 14(1), 47–62. https://doi.org/10.32679/jsda.v14i1.313

Issue

Section

PENULIS